Shopy 101

Photographs

Artemis III Booster Stacking Coverage - LH Aft Assembly

Free

CategoryPhotographs
FormatJPG
LanguageEN

About

Boeing employees, from left to right, Adam Shaffer, Electrical Ground Systems equipment and technical lead engineer; Anna Fischer, Space Launch System electrical engineering intern; Ethan Minvielle, Space Launch System electrical engineering intern; and Joseph Colangelo, Space Launch System Test and evaluation engineering intern, pose for a photograph following left-hand aft assembly solid rocket booster segment for NASA’s Artemis III SLS (Space Launch System) was secured to the mobile launcher at the agency’s Vehicle Assembly Building at NASA Kennedy on Thursday, July 9, 2026. The twin boosters, manufactured by Northrop Grumman in Utah, will provide more than 75 percent of the SLS rocket’s — NASA KSC · 2026. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.

How do I open it?

Use the Shopy 101 app to download it or read it in place. Anything you add to your library stays the same on every device.