Shopy 101

Fotoğraflar

Artemis I SLS Core Stage Prep for Lift/Mate

Ücretsiz

KategoriFotoğraflar
BiçimJPG
DilEN

Açıklama

Teams with NASA’s Exploration Ground Systems and contractor Jacobs begin to rotate the Space Launch System (SLS) core stage – the largest part of the rocket – into a vertical position in preparation for its move to High Bay 3 in the Vehicle Assembly Building, where it will be placed atop the mobile launcher in between the twin solid rocket boosters, at NASA’s Kennedy Space Center in Florida on June 11, 2021. The 188,000-pound core stage, with its four RS-25 engines, will provide more than 2 million pounds of thrust during launch and ascent, and coupled with the boosters, will provide more than 8.8 million pounds of thrust to send the Artemis I mission to space. Under the Artemis program, NAS — NASA KSC · 2021. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.

Kaynak ve lisans

KaynakNASA

Bu eser kamu malı ya da açık lisanslı. Lisans koşulları kaynağın kendi sayfasında yazılı.

Nasıl açılır?

Ürünü indirmek ya da uygulama içinde okumak için Shopy 101 uygulamasını kullan. Kitaplığına eklediğin her şey tüm cihazlarında aynı kalır.