About
In this view looking down from inside High Bay 3 of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on June 9, 2021, the fully stacked twin solid rocket boosters for the agency’s Space Launch System (SLS) rocket sit atop the mobile launcher. Teams with NASA’s Exploration Ground Systems and contractor Jacobs are making final preparations to integrate the boosters with the SLS core stage, which arrived at Kennedy in April 2020. Manufactured by Northrop Grumman in Utah, the twin boosters provide more than 75 percent of the total SLS thrust at launch. When integrated, the 212-foot, 188,000-pound core stage and twin boosters will provide more than 8.8 million pounds — NASA KSC · 2021. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.
How do I open it?
Use the Shopy 101 app to download it or read it in place. Anything you add to your library stays the same on every device.