Shopy 101

Photographs

Mobile Launcher Roll Back to the VAB

Free

CategoryPhotographs
FormatJPG
LanguageEN

About

During sunrise on Oct. 30, 2020, the mobile launcher for the Artemis I mission, atop crawler-transporter 2, departs Launch Pad 39B and moves slowly down the ramp on the crawlerway to return to the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. In view is the flame trench at the top of the pad. The nearly 400-foot-tall mobile launcher was at the pad for 10 days, while engineers with Exploration Ground Systems and Jacobs performed several tasks, including a timing test to validate the launch team’s countdown timeline, and a thorough, top-to-bottom wash down of the mobile launcher to remove any debris remaining from construction and installation of the umbilical arms. Arte — NASA KSC · 2020. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.

Source and licence

SourceNASA

This work is public domain or openly licensed. The licence terms are published by the source.

How do I open it?

Use the Shopy 101 app to download it or read it in place. Anything you add to your library stays the same on every device.